Power Uprates: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 85: | Line 85: | ||
| | | | ||
[[File:PUR Meetings Icon.png|60px|link=# | [[File:PUR Meetings Icon.png|60px|link=#Past_Workshop_Materials]] | ||
'''Workshop Material''' | '''Workshop Material''' | ||
| Line 111: | Line 111: | ||
<div class="mw-collapsible"> | <div class="mw-collapsible"> | ||
{| class="wikitable mw-collapsible mw-collapsed" style="vertical-align:bottom;" | {| class="wikitable mw-collapsible mw-collapsed" style="vertical-align:bottom;" | ||
|+ style="text-align:left;" | {{nowrap|EPRI Research}} | |+ style="text-align:left;white-space:nowrap;" | {{nowrap|EPRI Research}} | ||
|- | |- | ||
! Product ID | ! Product ID | ||
| Line 139: | Line 139: | ||
{| class="wikitable mw-collapsible mw-collapsed" style="vertical-align:middle;" | {| class="wikitable mw-collapsible mw-collapsed" style="vertical-align:middle;" | ||
|+ style="text-align:left;" | {{nowrap| NRC approved EPRI Topicals}} | |+ style="text-align:left;white-space:nowrap;" | {{nowrap| NRC approved EPRI Topicals}} | ||
|- style="vertical-align:bottom;" | |- style="vertical-align:bottom;" | ||
! Product ID | ! Product ID | ||
| Line 164: | Line 164: | ||
{| class="wikitable mw-collapsible mw-collapsed" style="vertical-align:bottom;" | {| class="wikitable mw-collapsible mw-collapsed" style="vertical-align:bottom;" | ||
|+ style="text-align:left;" | {{nowrap| Other Related EPRI Research}} | |+ style="text-align:left;white-space:nowrap;" | {{nowrap| Other Related EPRI Research}} | ||
|- | |- | ||
! Product ID | ! Product ID | ||
| Line 184: | Line 184: | ||
{| class="wikitable mw-collapsible mw-collapsed" | {| class="wikitable mw-collapsible mw-collapsed" | ||
|+ style="text-align:left;" | {{nowrap| Other Industry Documents}} | |+ style="text-align:left;white-space:nowrap;" | {{nowrap| Other Industry Documents}} | ||
|- style="vertical-align:bottom;" | |- style="vertical-align:bottom;" | ||
! Report Number | ! Report Number | ||
| Line 229: | Line 229: | ||
=[[File:PUR Meetings Icon.png|frameless|50 px|text-center]]Past Workshop Materials= | =[[File:PUR Meetings Icon.png|frameless|50 px|text-center]]Past Workshop Materials= | ||
<span style="color:red; font-weight:bold”> Must be logged in to view! </span> | <span style="color:red; font-weight:bold”> Must be logged in to EPRI.com to view "Attachments"! </span> | ||
<div class="mw-collapsible"> | <div class="mw-collapsible"> | ||
{| class="wikitable" | {| class="wikitable" | ||
Latest revision as of 16:22, 17 September 2026
Quick Links
|
Power Plant Uprate Database (PPUDB) |
Research |
Meetings |
Workshop Material |
Future Meetings
|
📅 Upcoming Activities TAG Meeting First Wednesday of every month 1:00 PM Eastern 2026 Power Uprate Workshop 9-11 September 2026 Charlotte, North Carolina Need an invite? Contact PUR PM |
Industry Documents for Power Uprates
| Product ID | Title | Description |
|---|---|---|
| 3002025839 | Power Uprate Supplmental Project Notice | Overview of what to expect from the Supplemental |
| 3002026402 | Facilitating Power Uprates at Nuclear Power Plants: Feasibility Study Guideline | An enhanced and updated methodology for performing the feasibility study of nuclear power plant power uprates. |
| 3002035186 | Power Uprate Margin Management Assessment (PUMMA) Tool v1.0 | An Excel-based tool for users to provide structured inputs on qualitative assessments of margin before and after a power uprate |
| 3002030461 | EPRI Power Plant Uprate Database (PPUDB) v1.0 | OE database of Power Uprates. Contains over 500 OE and we encourage everyone to add their experiences to benefit others. |
| 3002035182 | Assessment of the Status of International Extended Power Uprates | An overview of what is happening for power uprates outside of the United States |
| Product ID | Title | Description |
|---|---|---|
| 3002018337 | Use of Data Validation and Reconciliation Methods for Measurement Uncertainty Recapture: Topical Report, Revision 0-A | Establishes the technical basis for DVR for MUR uprates and perform related evaluations to substantiate the uncertainty claims of the DVR process. |
| 3002035151 | Loss-of-Coolant-Accident-Induced Fuel Fragmentation, Relocation and Dispersal with Leak-Before-Break Credit: Alternative Licensing Strategy (3002028673-A) | Provides a pathway for an individual plant licensee to request license amendments to address LOCA-induced FFRD in high burnup fuel. The proposed methodology supports the transition for the bulk of the PWR fleet to higher burnup and also provides a pathway to apply this approach to PWRs that are not specifically evaluated in this report. |
| 3002035149 | LOCA Analysis of Fuel Fragmentation, Relocation, and Dispersal for Westinghouse 2-Loop, 3-Loop, and 4-Loop Plants: Non-Proprietary-A | |
| 3002035150 | LOCA Analysis of Fuel Fragmentation, Relocation, and Dispersal for Westinghouse 2-Loop, 3-Loop, and 4-Loop Plants: Proprietary-A | |
| 3002036275 | Materials Reliability Program: xLPR Estimation of PWR Loss-of-Coolant Accident Frequencies (MRP-480-A) |
| Product ID | Title | Description |
|---|---|---|
| 3002013197 | Guidance for Implementing a Data Validation and Reconciliation Program at Nuclear Power Plants | Provides research and guidance for a plant to evaluate and implement DVR Methods contained in the German standard, VDI-2048, to monitor core thermal power |
| 3002018588 | Improving Heat Rate Calculations | Explores the use of DVR for heat rate monitoring with a focus on the reduction of heat rate uncertainties that DVR may permit |
| 3002032144 | Steam Generator Management Program: Calculating Primary-to-Secondary Leakage After an Accident Condition: Upper Bound Faulted Leak Rate as a Function of Operational Leakage | Presents the results of an investigation using an advanced probabilistic model to assess anticipated leakage under a range of accident conditions if the accident condition was entered while a measurable operational primary-to-secondary leakage was occurring |
| Report Number | Title | Description |
|---|---|---|
| NEI 08-10 | Roadmap for Power Uprate Program Development and Implementation, Rev 0, July 2009 | Provides guidance intended to promote excellence in executing power uprates at commercial operating nuclear power stations |
| IAEA NP-T-3.9 | Power Uprate in Nuclear Power Plants: Guidelines and Experience | Options for uprating the power level and information on current trends, licensing aspects, monitoring, lessons learned from many countries and verification technology. |
| INPO 09-003 | Systematic Management of Design and Operating Margins | Provides guidance for member utilities in identifying, evaluating, prioritizing, and resolving margin concerns |
| INPO 09-005 | Power Uprate Implementation Strategies – A Leadership Perspective | provides implementation insights and practical examples of how stations have achieved excellence during the development and installation of power uprate projects |
| GE NEDO-32424 (ML102220442) |
Generic Guidelines for General Electric Boiling Water Reactor Extended Power Uprate | Presents the generic criteria, methodology and scope of evaluation required to provide sufficient information for use by the Nuclear Regulatory Commission (NRC) to grant approval to anticipated specific applications for increases in the authorized thermal power level (power uprate) of GE Boiling Water Reactors (BWRs). This document covers uprates up to nominally 20% of the original licensed thermal power |
| GE NEDC-32523P-A | Generic Evaluations of General Electric Boiling Water Reactor Extended Power Uprate | Contains generic bounding analyses and equipment evaluations in support ofextended power uprate (up to 20 percent increased core thermal power) for boiling water reactors (BWRs) |
| GE NEDC- 33004P-A | Constant Pressure Power Uprate Licensing Topical Report | An approach to uprate reactor power that maintains the current plant reactor dome pressure |
| WEC NS-ES-0020 | Uprating Programs | Westinghouse's 3-Phase process for Power Uprates |
| US NRC RS-001 | Review Standard for Extended Power Uprates, | Provides guidance for the Nuclear Regulatory Commission (NRC) staff’s review of extended power uprate (EPU) applications to enhance consistency, quality, and completeness of reviews |
Past Workshop Materials
Must be logged in to EPRI.com to view "Attachments"!